Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Feb 02, 2021     38-4 Step 1-6 Rudder Pedals and Brake System - (4 hours)       Category: Controls
Prepared the F-6115 Rudder Pedal bearing block. Modified the F-1039 Bearing Block Mounting plate.Final drilled Bearing Block Mount Plate.
Preliminary mounted the bearing pro on both longerons. Preliminary installation of both rudder pedal assemblies.
First fitting is with original white rods, then i decided to paint them black. I also decided to install the parking brake assembly.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.